Mass Production.

Serialised traceability, SPC and full documentation per shipment.

Production

One facility, one certified line.

Our Dongguan facility runs automated assembly for mid-volume custom battery programs. The pilot line and production line share the same equipment settings, so the process you qualify at A/B/C sample stays the same in MP — no transfer surprises.

▮

Automated Winding & Stacking

Laser-aligned electrode stacking with inline CCD inspection.

✓

100% Electrical Screening

Every cell undergoes capacity, IR, OCV-drop and self-discharge aging before shipment.

🔒

Cell-ID Traceability

Laser-engraved serial on every cell links to materials lot, line, shift, operator and test results.

⚠

Safety Testing

Sample-based nail penetration, overcharge, thermal abuse, drop, crush and short-circuit.

📦

DGR Packaging

UN 38.3-compliant packaging for air, sea and rail. DDP shipping available.

⏱

Lead Time

4–6 weeks after sample approval for first MP lot. 3–4 weeks for repeat orders.

Quality System

Certifications that matter to your buyer.

StandardScope
ISO 9001Quality management (plant-wide)
IEC 62133Portable-cell safety (per cell model)
UN 38.3Transport safety (per cell model)
CB / CE / RoHSIssued per program and target market

Additional certifications — KC, PSE, BIS, UL 2054 — are coordinated through accredited partners on a per-program basis.

Operations

How a typical MP program runs.

Pre-production

Process FMEA, control plan and first-article inspection. Typical duration: 3–4 weeks.

Ramp-up

First lot at a conservative fraction of forecasted volume. SPC monitoring for capacity, IR and thickness. Ramp to full volume over 2–3 lots.

Steady state

Monthly review with cpk, ppm defect, on-time delivery and CAPA status. Forecasts locked typically 8 weeks out.

End of life

We commit to last-time-buy notice ahead of any discontinuation — a hard ask in this industry, but one of the reasons our customers stay.

MP line

Ready to lock in volume?

Share your 12-month forecast and target CIF port — we’ll return pricing, lead time and payment terms within 48 hours.

Request MP Quotation